10.06.22
Harris has had a long and successful history of working on the St. Olaf College campus. Our design team worked with the College and the other design partners to provide the best options and meet St. Olaf’s long-standing commitment to match or exceed the quality and aesthetics of their existing buildings.
Harris was committed to a strong buy-out process, performing a second and third buy-out comparison after design completion to ensure the ...
Read More
10.06.22
This project consisted of remodeling the old field house on the St. Olaf College campus into a new hockey arena. The ice arena is located inside Skoglund Fieldhouse. The updated design includes an NHL-size rink, seating for 800 fans, locker rooms for varsity hockey, and other ice-related program spaces.
Locating the rink inside Skoglund allowed for the campus to reuse an existing building envelope that already had the required utility infrastructure. The project also ...
Read More
10.06.22
Harris completed the renovation for the St. Olaf College Holland Hall. Holland Hall opened in 1925 and had its interior renovated in 1969. The 1969 renovation allowed for more space and usage, however, much of the Holland Hall’s original character was lost. This renovation of Holland Hall rebuilt and restored its original design, combining classic architecture and adaptable classrooms filled with modern teaching technologies. The updated Holland Hall houses the Economics, History, Philosophy, Political Science, Social Work and Family Studies, and ...
Read More
10.06.22
In 2012, the Church of Jesus Christ of Latter-day Saints announced plans to build the first Temple in Tucson, Arizona. The Tucson Arizona Temple will serve as a place of worship for the more than 30,000 active Latter-day Saints living in the Tucson area. The Tucson Arizona Temple will be the sixth temple built in Arizona. President Dieter Uchtodorf, the second counselor of the First Presidency of the Church, says the temple is for people who are members of ...
Read More
10.05.22
Harris bid this project as a hard bid project and was able to secure the project through our experience in this type of construction. The new building is 164,200 square feet and includes 262 new guest rooms. It has guest laundries, business center, training rooms, and exercise rooms. Harris installed a complete chilled and heating water central plant that included over 4 miles on hydronic piping on the project along with vertical stacked four pipe fan coils and multiple dedicated ...
Read More
10.05.22
Harris was awarded the mechanical and plumbing scopes for the second WeWork office space located on the Innovation Pointe campus. Harris’ outstanding performance and quality on previous WeWork projects was a key factor in securing this project. As a member of the design team for the Innovation Pointe Building Two Core & Shell project, Harris was able to provide design assistance for the WeWork design to help with integrating the new tenant space into the existing building systems. This ...
Read More
10.05.22
Harris was selected by Big-D Construction to perform the mechanical, plumbing and HVAC controls scopes as the Design-Assist subcontractor for the new Tooele Public Safety building. Located in Tooele, this 23,000-square-foot building is a new, state-of-the-art facility that houses the city’s law enforcement administration, records, patrol, investigations, secure detainee processing and evidence storage.
This facility also included a 2,000-square-foot multi-purpose training/community event space, victim services facility, health and fitness facilities and a centralized server and ...
Read More
10.05.22
Harris was awarded the Malouf Mezzanine Expansion design-build project for Malouf Fine Linens. The scope of the project included turning warehouse space into a two-level mezzanine office/retail/photo area for the client. Malouf came to Harris, with the help of Big D Construction, with a design concept they wanted to execute, including a new VRF system to suit their needs for the cooler climate of their location.
Harris designed an HVAC and plumbing system that included 4...
Read More
10.04.22
The Kearns Building project was a complete remodel of the plumbing, chilled, heating and HVAC systems in the Kearns Building, built in 1911.
The remodel of the Kearns Building was done in 2 phases. First, the plumbing was removed from floors 2-10 on the west side, keeping the east side restrooms in operation. Phase 1 also consisted of removing the existing chilled water system and associated equipment and installing new duct work on the west wings and future restrooms.
Read More
10.04.22
Harris was selected by Layton Construction and Argent Group as the design-builder for the mechanical and plumbing work on the new, Innovation Pointe development. This development consists of a 40-acre master plan with 600,000-square feet of development.
The Innovation Pointe 2 project was a five-story, 141,000-square-foot office building with supporting parking structure. It was designed with the needs of today’s businesses in mind, with leading edge technology and high-end finishes.
With the modern progressive architecture ...
Read More