Harris was awarded the design-assist contract for the new Sehome High School in Bellingham, Washington. This state-of-the-art facility fosters innovation and provides flexibility for future programmatic initiatives. New athletic fields, baseball, softball & football. The design focused on creating a healthy learning/teaching environment while being energy efficient and enhancing student safety.
Harris provided value engineering at the beginning of the project that saved the owner money while not sacrificing on quality. Some examples of value engineering ...
Read More
09.30.22
Lake Stevens High School was a multi-phased modernization of the existing facility on a 35.6-acre site. The project was a mix of additions, modernization and replacements. The school remained occupied and operational throughout all phases of construction and was surrounded by single-family residential neighborhoods. The student population is 1,800 consisting of grades 10-12. Design involved new or renovated general classrooms, art classrooms, science, technology, engineering, music, special education, athletics, performing arts, two gymnasiums, an existing pool, cafeteria/commons, library and ...
Read More
09.30.22
The Issaquah Middle School project is a progressive design-build project. Harris’ design partner for the project was Hargis. Harris performed the complete plumbing, including domestic, DWV, acid waste, hot water plant and fixture trim. We also performed the complete HVAC, including the boiler, water to water HP, chiller and all air handling equipment. Harris’ subcontractors included HVAC controls, insulation and test and balance.
A challenge on the project was the site had a 120′ elevation change causing the ...
Read More
09.30.22
The Building 101 Mental Health and Research Building project scope included all plumbing, medical gases and mechanical work associated with the 203,000 square-foot new building. Harris also installed a central plant upgrade and new utilities in an existing tunnel, all while not impacting the main hospital.
The new multi-story building incorporates 68,000 square feet of space for mental health services with 111,000 square feet dedicated to research and 20,000 square feet for administrative support. The VA Mental Hospital is built with the ...
Read More
10.08.21
Harris was awarded the design-assist contract for the $1.8 billion Allegiant Stadium Home of the Raiders. The stadium features 65,000 seats (expandable to 72,000), 9 exclusive clubs, over 120 high-end suites, a retractable natural turf field, large operable walls and a clear ETFE roof. Harris provided HVAC and plumbing for the entire stadium. We designed an alternative HVAC strategy to optimize energy efficiency, conform with structural allowances and meet the budget targets.
The mechanical scope included several major ...
Read More
10.13.20
A confidential client retrofitted additional space in their existing data center to house more servers. With the increase in capacity came the need to upgrade the mechanical systems responsible for keeping the data center cool. Harris was contracted to install the data center’s new backup generator and associated HVAC and piping.
In addition to the generator, Harris provided and installed new fuel oil piping as well as the day tank and stack for the new generator. ...
Read More
10.12.20
DC2 is a build-out of a Tier IV mission critical data center. The original facility was constructed in 2006, with enough space for future buildouts as the client’s expansion needs dictated. This data floor expansion began in January 2011, with a fully commissioned completion date of June 2011.
Harris worked with one of the largest data center builders in North America to provide total mechanical construction needs for a confidential client; with the general contractor providing the major pieces ...
Read More
10.12.20
The AAA data center in Clearfield, Utah manages all help-needed calls coming in from west of the Mississippi. They are a 24/7 operation.
AAA had cooling and humidification needs in their data storage areas. They also needed redundancy in their systems to allow for maintenance. Harris fit three floors with CRAC and humidification units to meet their desired set points. A challenge was to maintain a tight set point for the cooling and humidification. For cooling, redundant units ...
Read More
08.11.20
Harris was awarded the mechanical and plumbing scopes for the Level 4 and 5 WeWork office space at the Gateway 6 in Salt Lake City, Utah. The project was a retrofit in an existing office space, which required demo of existing systems and installation of new VAV’s, ductwork and piping. WeWork utilizes a number of open office areas with exposed ceilings, which made the quality of MEP installation a key component of the overall look and feel of the space. As ...
Read More
08.11.20
The Lafayette Building Veterans Administration Tenant Improvement project was a GSA modernization of an approximately 281,000 gross square-foot warm-lit shell. The modernization required an interior fit-out to meet the needs of the veterans.
The administration space fit-out included office spaces, core conference spaces, a training room, computer rooms, audio/visual studios and storage spaces. All the areas required interior finishes, suspended ceilings, light fixtures and adjustment of the protection systems. During construction, the building remained fully functional and ...