10.12.22
For the River Towers HVAC Revitalization and Remediation project, Harris was the general contractor with multiple subcontractors direct with the owner. The project was design-build with mechanical, electrical, structural and architectural scope of work. The project consisted of condos with (2) towers, one 30 stories and the other 18 stories. There were also boilers, snowmelt, pool heating, plumbing heating and a 200-foot lattice flue structure up through the center of the building. This was an HVAC retrofit project that also ...
Read More
10.12.22
The Ridgeview Medical Center Surgery Remodel project was awarded to Harris as a design-build project. Harris provided the ductwork, design and engineering, HVAC, medical gas piping plumbing and test and balance for the project. We added new radiant panels above the patient beds along with a new headwall layout. The remodel was approximately 6,000 square feet and consisted of 23 beds.
This project was completed in ...
Read More
10.11.22
Once Harris completed construction of the new Park Nicollet clinic and ramp, it was time to get started on remodeling the existing clinic. The existing clinic is roughly 80,000 square feet and is to remain open during construction.
Knutson Construction worked with the owner and put together a multi-phased schedule. Each phase would cover a certain area of the clinic while the surrounding areas remained open to patients. Multiple phases on a building of ...
Read More
10.11.22
The Park Nicollet Specialty Center and Parking Ramp project is a new 86,000 square-foot clinic in Burnsville, Minnesota. The project consisted of building both a new three-story clinic and specialty care center, as well as a three-level parking garage. The clinic will include a same-day surgery center, urgent care center and medical and surgical specialty care.
Harris provided the ductwork, design and engineering, HVAC, mechanical piping, medical gas piping, plumbing and preconstruction services. A ...
Read More
10.10.22
Harris worked with Standby Systems Inc to fabricate 13 skids for a General Electric propane vapor system to be installed in the country of Ghana, Africa. The skids, which were shipped internationally, contained piping, pumps, valves, heat exchangers, structural frames and supports for the metering and vaporization of the propane.
Framing and piping for the skids were constructed from 304 stainless steel, which quality specifications were required to meet the pressure equipment directive (PED) of ...
Read More
10.06.22
Harris has had a long and successful history of working on the St. Olaf College campus. Our design team worked with the College and the other design partners to provide the best options and meet St. Olaf’s long-standing commitment to match or exceed the quality and aesthetics of their existing buildings.
Harris was committed to a strong buy-out process, performing a second and third buy-out comparison after design completion to ensure the ...
Read More
10.06.22
This project consisted of remodeling the old field house on the St. Olaf College campus into a new hockey arena. The ice arena is located inside Skoglund Fieldhouse. The updated design includes an NHL-size rink, seating for 800 fans, locker rooms for varsity hockey, and other ice-related program spaces.
Locating the rink inside Skoglund allowed for the campus to reuse an existing building envelope that already had the required utility infrastructure. The project also ...
Read More
10.06.22
Harris completed the renovation for the St. Olaf College Holland Hall. Holland Hall opened in 1925 and had its interior renovated in 1969. The 1969 renovation allowed for more space and usage, however, much of the Holland Hall’s original character was lost. This renovation of Holland Hall rebuilt and restored its original design, combining classic architecture and adaptable classrooms filled with modern teaching technologies. The updated Holland Hall houses the Economics, History, Philosophy, Political Science, Social Work and Family Studies, and ...
Read More
10.05.22
Harris was awarded the Malouf Mezzanine Expansion design-build project for Malouf Fine Linens. The scope of the project included turning warehouse space into a two-level mezzanine office/retail/photo area for the client. Malouf came to Harris, with the help of Big D Construction, with a design concept they wanted to execute, including a new VRF system to suit their needs for the cooler climate of their location.
Harris designed an HVAC and plumbing system that included 4...
Read More
10.04.22
Harris was selected by Layton Construction and Argent Group as the design-builder for the mechanical and plumbing work on the new, Innovation Pointe development. This development consists of a 40-acre master plan with 600,000-square feet of development.
The Innovation Pointe 2 project was a five-story, 141,000-square-foot office building with supporting parking structure. It was designed with the needs of today’s businesses in mind, with leading edge technology and high-end finishes.
With the modern progressive architecture ...
Read More