The Hill Air Force Base located in northern Utah is the sixth largest employer in the state and home of the Ogden Air Logistics Complex which manages a wide range of aircrafts. The Hill AFB Fire Crash Rescue Facility supports the base’s flight line operations and is a critical life safety facility.
Harris took a Design-Build role on the project, working closely with Colvin Engineering to design and install the plumbing, piping and HVAC systems in ...
Read More
10.04.22
Harris remodeled the HVAC and plumbing systems in a 101,000 square-foot warehouse. The space was originally a retail location and was made into a family fun/amusement center. We started underslab and cut in new plumbing for six new restrooms. The existing RTUs were retrofitted with new duct work to accommodate the new spaces. The new spaces included a laser tag area, mini golf, bowling alley and party rooms.
Several issues were resolved by our team. These included ...
Read More
10.04.22
The Williams International – Blue Phoenix Ogden Addition project was a new manufacturing plant for Williams International in Ogden, Utah. This was a fast-paced project where the mechanical and plumbing design was happening while the shell of the building was going up. From design initiation to completion, the total duration was 8 months. This included the design of a highly efficient process cooling system that incorporated four fluid coolers, four air handlers, and three water cooled chillers. This project ...
Read More
10.03.22
The Martin Bostetter Courthouse is a historic building located in Old Town Alexandria, Virginia. The project presented many challenges from design to completion. The project was completed one-hundred percent during the night hours. This alone made it difficult to manage but location was key. Harris had seven tractor trailers loaded with equipment parked in an area that was barely large enough for a passenger vehicle to pass. Noise was also an issue during the night hours.
Other ...
Read More
10.03.22
This project for the US Army Corp of Engineers consisted of design and construction of an existing barracks building. The building was converted into administrative space for a designated end user. The design and construction included demolition of all existing engineering systems. Demolition of the existing architectural systems included the roof, exterior doors, and windows. This project also included design and construction of completely new engineering systems to include site work, HVAC, plumbing, fire protection, electrical, communication, and structural ...
Read More
09.30.22
The Whatcom Community College Student House Phase 1 is an 89,000-square-foot, 221 bed dormitory facility. Additionally, it includes administration offices, public rest rooms, laundry, a mechanical equipment room, kitchen and community rooms. The structure is wood framing with electric cove heat in the dormitories, VRF in the offices and packaged DX units for the community rooms.
Harris contributed by developing an early schematic design budget that yielded excellent value for the owner. We were able design to this budget ...
Read More
09.30.22
The Issaquah Middle School project is a progressive design-build project. Harris’ design partner for the project was Hargis. Harris performed the complete plumbing, including domestic, DWV, acid waste, hot water plant and fixture trim. We also performed the complete HVAC, including the boiler, water to water HP, chiller and all air handling equipment. Harris’ subcontractors included HVAC controls, insulation and test and balance.
A challenge on the project was the site had a 120′ elevation change causing the ...
Read More
09.30.22
The Compass Health Supportive Housing project is a five-story, 47,000-square-foot building with 82 housing units for low-income individuals with chronic mental illness. This includes studios and one- and two-bedroom units, with a recreation room, computer center and common laundry. The ground floor will have over 10,000 square feet for mental health and homelessness programs, including peer support, homeless outreach and housing stabilization.
Harris was the Design-Build partner for the project and was responsible for the plumbing systems for the ...
Read More
10.08.21
Harris was awarded the design-assist contract for the $1.8 billion Allegiant Stadium Home of the Raiders. The stadium features 65,000 seats (expandable to 72,000), 9 exclusive clubs, over 120 high-end suites, a retractable natural turf field, large operable walls and a clear ETFE roof. Harris provided HVAC and plumbing for the entire stadium. We designed an alternative HVAC strategy to optimize energy efficiency, conform with structural allowances and meet the budget targets.
The mechanical scope included several major ...
Read More
03.22.18
Harris was selected by Layton Construction and Argent Group as the design-builder for the mechanical and plumbing work on the new Innovation Pointe development. This development consists of a 40-acre master plan with 600,000-square feet of development.
The current project is a five-story, 140,000-square foot office building with supporting parking structure. It was designed with the needs of today’s businesses in mind, with leading edge technology and high-end finishes.
With the modern progressive architecture ...