08.11.20

WeWork TI @ Gateway 6

Harris was awarded the mechanical and plumbing scopes for the Level 4 and 5 WeWork office space at the Gateway 6 in Salt Lake City, Utah. The project was a retrofit in an existing office space, which required demo of existing systems and installation of new VAV’s, ductwork and piping. WeWork utilizes a number of open office areas with exposed ceilings, which made the quality of MEP installation a key component of the overall look and feel of the space. As ...Read More
08.11.20

VA Lafayette Building

The Lafayette Building Veterans Administration Tenant Improvement project was a GSA modernization of an approximately 281,000 gross square-foot warm-lit shell. The modernization required an interior fit-out to meet the needs of the veterans. The administration space fit-out included office spaces, core conference spaces, a training room, computer rooms, audio/visual studios and storage spaces. All the areas required interior finishes, suspended ceilings, light fixtures and adjustment of the protection systems. During construction, the building remained fully functional and ...Read More
08.11.20

Tesla Gigafactory

Harris’ scope included plumbing, mechanical piping, process piping and ductwork. This was a highly collaborative design-assist project. The facility is approximately 5.3 million square feet of operational production and advanced manufacturing space across multiple floors and several acres. Harris delivered solutions on several challenges throughout the project. The local union hall was not adequately staffed for a project this size. Harris met with the top leaders of the International Unions to discuss nationwide workforce availability and develop recruiting ...Read More
08.11.20

Reagan National Airport Secure National Hall

The Secure National Hall project includes the construction of two 500,000-square foot additions to the west side of existing Terminal B-C to house passenger security screening, airline check-in, concessions, restrooms and various information kiosks. Harris will install six custom air handling units along with plumbing in the new guest restrooms. Despite the complexities involved in working in a fully functioning airport, we are slated to complete the project within schedule in 2021. One challenge met by this project ...Read More
08.11.20

Reagan National Airport New North Concourse

The Reagan National Airport New North Concourse is a three-level, 230,000-square-foot, $374 million concourse, which is part of a larger $1 billion terminal redevelopment plan at Ronald Reagan Washington National Airport in Arlington, Virginia. The new 14-gate concourse will replace onsite bus service to regional carriers with passenger bridges, keeping travelers out of the elements and giving them easier access to flight information and new amenities like retail, food, an airport club and device-charging outlets. There will also be a new ...Read More
08.11.20

Prescott VA Mental Health Building

Harris was chosen to install the plumbing and HVAC for the Prescott VA Mental Health Building. The plumbing systems were cast iron underground waste piping, cast iron above ground waste and vent piping. The domestic water systems are standard copper with re-circulated hot water systems. The systems did not require any special medical gases or special equipment, making installation easier. On the HVAC side, Harris installed a 48 well geothermal piping system, including site piping to the mechanical ...Read More
08.11.20

Phoenix International Raceway

The Phoenix International Raceway project was a combination of three phases; a renovation of the existing grandstands, new grandstands and 13 new buildings located in the infield of the track. Each phase included plumbing, sheetmetal ductwork for the suites, track operations, concessions, kitchens and toilet facilities. The project was scheduled in phases over two years with milestone dates that had to be met before the race events in April and November. Race day could not be impacted by ...Read More
08.11.20

Owatonna Energy Station

Harris performed the complete mechanical installation for Southern Minnesota Municipal Power’s 38.8 MW natural gas-fired power plant in Owatonna, MN. The plant was designed to replace the power generating capacity the city lost during a flood in 2010. The plant consists of four new Caterpillar 10 MW gas-fired generators as well as related piping and equipment. Harris installed the engine support piping which included air piping, lube oil piping, natural gas piping, used oil piping, glycol piping and cooled ...Read More
08.11.20

Marshfield Cancer Center + Hospital Expansion

Harris recently completed the Marshfield Clinic Health System’s 200,000-square foot hospital and a 40,000-square foot cancer center expansion. The project includes a new central heating and cooling plant. The clinic’s mechanical systems are currently connected by underground tunnels with the hospital feeding the cancer center from a central chilled water, hot water and medical gas system. This fast track project was split into two phases with phase one, the cancer center having less than a ...Read More
08.11.20

ESPN Studio + Offices

Harris was awarded the contract for the new ESPN Studio at The Linq Hotel along the Las Vegas Strip. The project will include 2,300 square feet of new studio space and 2,400 square feet of renovated office space. The new studio will be ESPN’s Vegas hub during major sporting events along with other related content. Harris will provide both HVAC and plumbing for both the studios and office space. There will be three different studios built that overlook ...Read More