Blue Cross Blue Shield of Minnesota N4 and River Park Upgrade

Harris partnered with Blue Cross Blue Shield of Minnesota (BCBS) to complete a building automation retrofit for two buildings on the Blue Cross campus in Eagan, Minnesota. In addition to the automation upgrades, Harris also provided JACE and graphic updates for 11 additional buildings. The project was based on an aggressive schedule to limit disruption. To ensure client satisfaction, Harris established open communications and a full understanding of the long-term vision BCBS had for the building automation system. ...Read More
01.13.17

American Airlines Office and Data Center Renovation

Harris helped American Airlines renovate their office and data center to adjust to changing business needs. Construction took place in four phases to accommodate the occupants. One phase of the project scope included removal of seven existing fluid cooler fan sections and replacing them with new fan sections. This work had to be scheduled with the owner so that at least two existing fluid coolers and a redundant cooler were always online. The owner’s data center ...Read More
01.13.17

East Valley Bus Operations Center

This project included the renovation of the existing East Valley Bus Operations Center. Scope of work included removing and replacing 34 existing under-floor air distribution terminal boxes located in the administration building. This work was completed in phases to accommodate staff working in the building during construction. Scope also included overhead work to install four new supply air ducts and new controls for the under-floor terminal units. All units were tied in to existing BAS and test and ...Read More
10.31.16

T-Mobile Arena

The newest edition to the world-famous Las Vegas Strip is the 20,000-seat T-Mobile Arena which will not only be the home of the NHL expansion Vegas Golden Knights, but host to numerous concerts and special events. From CAD coordination and prefabrication capabilities to our outstanding leadership in the field, Harris took a prominent role in the designing and implementation of the plumbing and mechanical systems which had to adhere to stringent technical guidelines and specifications set forth by the ...Read More
10.31.16

Project CityCenter

Located on the world-famous Las Vegas Strip, CityCenter is one of the crown jewels of Las Vegas. Project CityCenter is also the largest privately funded LEED project in American history. Early in the project, Harris was brought on as a design-assist partner. However, as the project moved forward, it became evident that the design team was becoming overwhelmed by the sheer size of the project and the owner looked to the Harris team for help. Harris took ...Read More
10.31.16

UNLV Science and Engineering Building

The Science and Engineering Building (SEB) is a state-of-the-art facility located on the campus of the University of Nevada-Las Vegas (UNLV). When the building was first designed, UNLV wanted a research facility that was not only innovative, but energy efficient and they turned to Harris to make that a reality. The systems that Harris installed use 32 percent less energy and 42 percent less water than laboratory buildings of the same size. The SEB project was awarded a LEED Silver rating, ...Read More
10.31.16

Project Phoenix

Molycorp Project Phoenix is a remote, heavy rare earth concentrate facility located in Mountain Pass, California. Rare earth material is used in the construction of computers, silicon chips, cell phones, high-yield batteries, military technology and other high-tech applications. The mining process at Project Phoenix involves technology and processes in use for the first time. The mine’s unique specifications required Harris to adapt new welding procedures as it installed the mine’s tanks and process piping on ...Read More
06.10.16

U of U Marriott Library Phases I, II, III (2015-2018)

Harris worked to improve the quality of the University of Utah Marriott Library’s occupant comfort by providing a retrofit of variable air volume (VAV) air handling systems and controls including piping modifications to relocate water pipes from above the Rare Books Vault. To avoid disrupting students and faculty, Harris made special arrangements to work during fall break when the library had fewer users. Sections of the library were isolated to keep the occupants safe and reduce disturbances. Read More
06.10.16

U of U S.J. Quinney College of Law

Harris was awarded a contract to provide HVAC controls on new construction for the prestigious S.J. Quinney College of Law Building at the University of Utah. As part of its services, Harris installed new controls including six-way control valves on chilled beams, heating/cooling water controls and air handling units. The controls included a 375,000-gallon thermal storage tank, that allows the use of chillers during off peak hours. This project had strict deadlines and ...Read More
05.26.16

U of M Amundson Hall Gore Annex Addition/Upgrades

The University of Minnesota’s Amundson Hall Lab Addition is a 42,000-square foot chemistry lab addition known as the Gore Annex. Remodel involved complete plumbing, HVAC, controls and fire protection services. Sandwiched between buildings, the remodel of the 65-year-old building took place in occupied lab spaces with frequent student traffic. Lab air balancing was affected by existing building systems which required additional project team work to resolve. Harris provided a substantial amount of value engineering ...Read More