03.23.18

Minnesota State Capitol Restoration

In June 2013, Harris was selected to provide the demolition and replacement of all existing plumbing, HVAC piping and sheet metal and temperature control systems for the restoration of the more than 100-year-old historic Minnesota State Capitol building. After 100+ years of service, the Capitol building had reached a critical deterioration point with a crumbling exterior, antiquated mechanical and electrical infrastructure, and inadequate life safety systems. The project team worked hard to overcome the challenges associated with ...Read More
03.22.18

U of U Garff Executive Education Building

The David Eccles School of Business at the University of Utah offers students over two dozen courses for students pursuing their undergraduate and master degrees. Nestled in the heart of the “Silicone Slopes”, the University serves approximately 4,500 students annually. The Garff Executive Education building will house the University’s graduate program. Jacobsen Construction Co selected Harris to be the mechanical and plumbing contractor for the new 150,000-square foot classroom and executive training facility. The mechanical ...Read More
03.22.18

SLCC Westpointe Center

Harris was selected by Big-D Construction as the mechanical and plumbing subcontractor for the new Salt Lake Community College (SLCC) Westpointe Career and Technical Education Center. Located in Salt Lake City, this two-story, 121,000-square foot building is a new, state-of-the-art education facility that houses skills labs, classrooms, faculty offices and administrative support. This facility will include all the training equipment and tools to help advance individuals in their careers in Advanced Composites, Diesel Systems Technology, Machining, Manufacturing, ...Read More
03.22.18

Steven F. Udvar-Hazy Center Upgrade Chiller Plant

Facing the challenge of preserving sensitive historical artifacts, Harris was the selected mechanical contractor for the Steven F. Udvar-Hazy Center at the National Air and Space Museum in Chantilly, Virginia. This chiller plant upgrade project was designed to replace three existing 1,200-ton cooling towers that had reached maximum capacity, with 1,400-ton towers for the central chilled water plant, provide 250-ton air cooled chiller for the supplemental load and to add six new ice building tanks to the building’s 24 ...Read More
03.22.18

Monte Carlo Park Theater

Adjacent to the newly constructed T-Mobile Arena, the home of the completed Monte Carlo Park Theater is the cornerstone for entertainment in the new Park District on the world-famous Las Vegas Strip. Harris was selected to install new plumbing, piping and HVAC systems for the new concert hall/theater located inside the Monte Carlo Casino. This state-of-the-art theatre features seating for 5,200 guests across three seating levels, seven bars and one of the widest stages in the world.Read More
03.22.18

HCMC Ambulatory Outpatient Specialty Center

The Hennepin County Medical Center (HCMC) Ambulatory Outpatient Specialty Center was initially designed to relocate over 20 different departments associated with HCMC into one building. As the design progressed, more square footage was added to accommodate additional departments. Increased project square footage as well as more densely used space truly pushed the limits of the design and the budget. To help smooth the process, Harris worked with the design and the construction team to track the budget from schematic design ...Read More
05.16.17

TRIA Orthopaedic Center

Harris teamed with Kraus-Anderson Construction to build the new state-of-the-art, 84,000-square foot TRIA Orthopaedic Center in Woodbury, Minnesota. The facility offers orthopaedic and sports medicine services including a walk-in clinic, ambulatory surgery center and on-site rehabilitation services. Harris provided HVAC, plumbing and medical gas services for the facility, including operating rooms, MRI and therapy pool. Manufacturing greatly increased Harris’ installation speed and efficiency. The team manufactured the center’s VAV boxes into racks and was able to ...Read More
01.16.17

Gopher Resource Afterburner

Harris installed a new afterburner for Gopher Resource’s Tampa facility. The scope included installation of a new afterburner, support structure, platforms, walkways and necessary piping and duct to make operational. The new afterburner was installed in an operating lead recycling smelter plant. Harris personnel needed to safely perform their work in an environment filled with lead dust and with ambient temperatures of 131 degrees Fahrenheit. Safety was an important consideration in delivering a successful project in these ...Read More
10.31.16

T-Mobile Arena

The newest edition to the world-famous Las Vegas Strip is the 20,000-seat T-Mobile Arena which will not only be the home of the NHL expansion Vegas Golden Knights, but host to numerous concerts and special events. From CAD coordination and prefabrication capabilities to our outstanding leadership in the field, Harris took a prominent role in the designing and implementation of the plumbing and mechanical systems which had to adhere to stringent technical guidelines and specifications set forth by the ...Read More
10.31.16

Project CityCenter

Located on the world-famous Las Vegas Strip, CityCenter is one of the crown jewels of Las Vegas. Project CityCenter is also the largest privately funded LEED project in American history. Early in the project, Harris was brought on as a design-assist partner. However, as the project moved forward, it became evident that the design team was becoming overwhelmed by the sheer size of the project and the owner looked to the Harris team for help. Harris took ...Read More