06.10.14
Harris completed a total of six projects for the Solana Generating Station. The solar power plant located near Gila Bend, Arizona features parabolic shaped mirrors mounted on structures that track the sun and concentrate the sun’s rays to provide heat to power a conventional turbine.
Harris installed over 170,000 linear feet of large bore carbon steel welded pipe over a three-square mile area. Our dedicated work force peaked with 150 pipefitters working up to two 12-hour shifts seven ...
Read More
06.10.14
The 85,000-square foot Lookout Mountain Elementary School project was unique in that Harris, working for Adolfson & Peterson Construction, was responsible for the installation of the HVAC system involving the installation of a geothermal field and water source heat pumps. A portion of the design centered around a more traditional heating system but around 50 percent of the complex was served by this geo system.
Read More
06.10.14
Located adjacent to the existing Portland Medical Center, the Providence North Pavilion Medical and Cancer Center is an 11-story, 490,000-square foot building that houses physicians who specialize in major tumor types as well as internationally recognized researchers performing bench-to-bedside clinical trials. The facility also includes a learning center, a holistic health and counseling center, laundry facilities and a spa.
A state-of-the-art, 100 percent outside air system with high accuracy airflow terminal units provide constant pressure relationships, helping minimize ...
Read More
06.07.14
Harris provided a broad range of mechanical services for the construction of the wetlands and environmental science center Cascade Meadow.
Designed to operate as a high performance green building, the project incorporated energy-efficient construction, passive solar design, and focused on meeting indoor environmental quality and renewable energy standards. The facility is used to educate adults and children on energy conservation and healthy indoor spaces.
To meet the project’s goal to use 53 percent less energy ...
Read More
06.06.14
Mayo Clinic opened the first facility in the Midwest capable of providing proton beam therapy used to treat cancer. The building features four treatment rooms that include a three-story, 190-ton mechanical apparatus (gantry) needed for the proton beam and a 20-ton magnet to guide the beam. Due to the size, weight and radiologic properties of the equipment involved, the size and thickness of concrete in this building is unprecedented in this area with the thickest wall measuring 21-feet nine-inches ...
Read More
06.05.14
The Minnesota Correctional Facility – Faribault is a medium-security, level-three facility. Harris provided mechanical services for the multi-phased expansion and renovation. The project included the addition of three new living units, program buildings (psychological, religious, volunteer and education services), dining/kitchen area and the renovation of the senior care/special needs facility. Both the expansion and renovation occurred on a fast-track with multiple bid packs allowing prison operations to continue during construction.
Harris provided plumbing, heating piping and ...
Read More
06.04.14
Located on a 109-acre site, Otter Tail Ag – a 55 million gallon per year ethanol plant – takes corn grown by local farmers and turns it into ethanol. Harris was chosen as the prime contractor for this project and oversaw the complete construction of the plant.
Harris teamed with Delta-T Corp on the design technology, and after months of development and pricing, contracts were signed in October of 2006 and civil site work began immediately. To facilitate construction, Harris developed ...
Read More
06.04.14
Harris installed mechanical systems that were designed to accommodate the anticipated expansion of Abbott Northwestern Hospital into a newly constructed a 6,600-square foot mechanical penthouse built on the rooftop of the hospital’s East Tower.
To meet the aggressive schedule set for the project, Harris utilized its in-house BIM capabilities to create an exact replica of the finished HVAC, piping and plumbing systems, and manufactured all ducts and pipework at the Harris’ Zumbrota fabrication shop. This approach ...
Read More
06.04.14
Harris served as the Engineer of Record for the Bielenberg Sports Center Expansion project in Woodbury, Minnesota. The expansion project encompassed various buildings that included design and installation of the following:
Energy efficient, high performance heating and cooling central plant consisting of eight water-to-water nominal 60-ton heat pumps.
Ice making central plant consisting of three water-to-water nominal 60-ton heat pumps.
Well field consisting of three groups of 50 bores each with five circuits ...
Read More
06.04.14
Always mindful of the future, Hormel and the Harris design team chose to incorporate green building practices into the construction of the office 28,000-square foot addition that was awarded LEED Gold certification.
Some of the sustainable aspects of the building included:
Geothermal heating and cooling systems, utilizing vertical bore well loops
Low-flow plumbing fixtures for water conservation
Rainwater collection cistern
All heating and cooling systems are controlled via ...
Read More