01.18.17

Phoenix Union Coding Academy

Harris provided and installed the mechanical equipment and condensate piping for the Phoenix Union Coding Academy. This new, 40,693-square foot school contains classrooms, maker’s lab, divided classroom with moveable walls, two labs and a full gym/cafeteria. The project included several specialty features which Harris was able to install successfully. For the lab spaces, Harris installed stainless steel lab exhaust ductwork and performed the welding in-place. Some areas required grease ductwork. The gym and maker’s ...Read More
01.16.17

Gopher Resource Afterburner

Harris installed a new afterburner for Gopher Resource’s Tampa facility. The scope included installation of a new afterburner, support structure, platforms, walkways and necessary piping and duct to make operational. The new afterburner was installed in an operating lead recycling smelter plant. Harris personnel needed to safely perform their work in an environment filled with lead dust and with ambient temperatures of 131 degrees Fahrenheit. Safety was an important consideration in delivering a successful project in these ...Read More
01.13.17

Cannon Falls High School Renovation

The Cannon Falls High School Ventilation Improvement project had a very aggressive schedule. Nearly all the work needed to be completed during the summer months while school was not in session. At the peak, we had 40 people working on-site, in addition to those fabricating in the shop. At a time when the labor market was very tight, we were able to leverage resources from Harris’ Rochester, Zumbrota and St. Paul offices to complete the project without delay. ...Read More
01.13.17

American Airlines Office and Data Center Renovation

Harris helped American Airlines renovate their office and data center to adjust to changing business needs. Construction took place in four phases to accommodate the occupants. One phase of the project scope included removal of seven existing fluid cooler fan sections and replacing them with new fan sections. This work had to be scheduled with the owner so that at least two existing fluid coolers and a redundant cooler were always online. The owner’s data center ...Read More
01.13.17

East Valley Bus Operations Center

This project included the renovation of the existing East Valley Bus Operations Center. Scope of work included removing and replacing 34 existing under-floor air distribution terminal boxes located in the administration building. This work was completed in phases to accommodate staff working in the building during construction. Scope also included overhead work to install four new supply air ducts and new controls for the under-floor terminal units. All units were tied in to existing BAS and test and ...Read More
10.31.16

T-Mobile Arena

The newest edition to the world-famous Las Vegas Strip is the 20,000-seat T-Mobile Arena which will not only be the home of the NHL expansion Vegas Golden Knights, but host to numerous concerts and special events. From CAD coordination and prefabrication capabilities to our outstanding leadership in the field, Harris took a prominent role in the designing and implementation of the plumbing and mechanical systems which had to adhere to stringent technical guidelines and specifications set forth by the ...Read More
10.31.16

Project CityCenter

Located on the world-famous Las Vegas Strip, CityCenter is one of the crown jewels of Las Vegas. Project CityCenter is also the largest privately funded LEED project in American history. Early in the project, Harris was brought on as a design-assist partner. However, as the project moved forward, it became evident that the design team was becoming overwhelmed by the sheer size of the project and the owner looked to the Harris team for help. Harris took ...Read More
10.31.16

UNLV Science and Engineering Building

The Science and Engineering Building (SEB) is a state-of-the-art facility located on the campus of the University of Nevada-Las Vegas (UNLV). When the building was first designed, UNLV wanted a research facility that was not only innovative, but energy efficient and they turned to Harris to make that a reality. The systems that Harris installed use 32 percent less energy and 42 percent less water than laboratory buildings of the same size. The SEB project was awarded a LEED Silver rating, ...Read More
10.31.16

Project Phoenix

Molycorp Project Phoenix is a remote, heavy rare earth concentrate facility located in Mountain Pass, California. Rare earth material is used in the construction of computers, silicon chips, cell phones, high-yield batteries, military technology and other high-tech applications. The mining process at Project Phoenix involves technology and processes in use for the first time. The mine’s unique specifications required Harris to adapt new welding procedures as it installed the mine’s tanks and process piping on ...Read More
06.10.16

U of U Marriott Library Phases I, II, III (2015-2018)

Harris worked to improve the quality of the University of Utah Marriott Library’s occupant comfort by providing a retrofit of variable air volume (VAV) air handling systems and controls including piping modifications to relocate water pipes from above the Rare Books Vault. To avoid disrupting students and faculty, Harris made special arrangements to work during fall break when the library had fewer users. Sections of the library were isolated to keep the occupants safe and reduce disturbances. Read More