09.03.13
Harris worked extensively with stakeholders and St. Olaf College to design and install a new, sustainable science center. Much of the piping, duct systems and fixture assemblies for the 180,000-square foot building were prefabricated in Harris’ fabrication shop, allowing our company to comply with LEED certification requirements, complete work ahead of schedule and reduce time in the field.
To adhere to LEED certification requirements, Harris used low-VOC emitting adhesives and sealants for duct and pipe connections. A ...
Read More
09.03.13
Harris was contracted to provide design-assist mechanical services for this hospital expansion and remodeling project. The project included a new central plant containing boilers, chillers and generators, as well as an addition adding medical/surgical rooms and administration space. The addition was built with the capacity to add another four floors and additional space as necessary.
Several mechanical systems were manufactured by Harris off-site to streamline installations. As this is a healthcare facility, all the manufactured pieces ...
Read More
09.03.13
HealthSouth East Valley Rehabilitation Hospital is a new, 40-bed acute medical rehabilitation hospital totaling 47,500 square feet.
Harris provided complete plumbing and mechanical systems for the new hospital including medical gas piping, oxygen and vacuum systems. The project included the first installation of Trane’s water-cooled variable air volume (VAV) air handling systems; complete with an internal-cooling tower to provide maximum efficiency to the system. Harris also installed a complete medium and low-pressure ductwork distribution system including VAV ...
Read More