12.07.15
Utilizing Lean construction techniques and an integrated project delivery shared risk/reward contract, Harris performed design-assist HVAC and virtual design and construction (VDC) services for the new Alta Bates Medical Center Merritt Pavilion. The new, 250,000-square foot medical facility is a state-of-the-art medical/surgical patient tower with acute rehabilitation services, on-premises pharmacy and nuclear medicine. This iconic building also brings the campus into compliance with California’s strict seismic safety requirements.
The Merritt Pavilion was designed to ...
Read More
12.04.15
Harris provided design-build services to JE Dunn Construction to build a new five-story hotel in Woodbury, Minnesota. This 150-room hotel serves corporate clients and business travelers in the eastern suburbs including 3M, Anderson Windows and HealthEast. Hotel amenities included a full-service kitchen, restaurant, bar, exercise room, indoor pool, and meeting and event space.
Harris was contracted to provide the design, engineering, plumbing, HVAC and controls scope for the project. A heavy emphasis on preconstruction services allowed the ...
Read More
11.10.15
Harris helped Novus Energy LLC design and build a mobile demonstration plant. The demonstration plant is a trailer-mounted, waste-to-energy conversion system which is fully integrated with its own automated control system. The system is a completely functional plant capable of converting high-solid organic materials to methane-rich bio-gas, organic fertilizer and clean water.
The demonstration plant has been used to showcase new technology and fine-tune the design configuration for full-scale plants. It has been operating since 2010 and has ...
Read More
10.05.15
Harris provided the HVAC sheet metal required for Los Angeles International Airport’s overhaul of their central plant. Overall, Harris fabricated 120,000 pounds of sheet metal for the project and ensured proper procedures were followed for the client’s LEED Gold certification goals.
The transportation of people and equipment was a major challenge for the project team. The lay down area was five miles away from the project site through heavy traffic. To reduce time spent on the ...
Read More
09.25.15
Harris construction and controls teams collaborated on this state-of-the-art inpatient pharmacy conveniently located on the first floor of the hospital. The pharmacy relocation project was a complete design-build effort aiming to transform an existing hospital space into a new inpatient pharmacy that satisfied the needs of the Minneapolis Children’s Hospital.
The goal of the design and subsequent construction was to provide the hospital with a fail-safe, stand-alone mechanical system for three new clean rooms. To make ...
Read More
09.23.15
Citing their obsolete boilers and growing energy demands, the University of Minnesota turned to Harris for help with the installation of a state-of-the-art combined heat and power plant for their Minneapolis campus.
Due to zoning and permitting constraints, the new turbine, heat recovery system and modern mechanical systems had to fit in the historic Old Main Heating Plant. To head off space issues and potential clashes, Harris and its partners relied on 3-D modeling to detect and ...
Read More
04.20.15
Qteros is a biofuel startup that produces ethanol from various biomass feedstocks. The cellulosic ethanol fermentation pilot plant can produce about 1,000 gallons of ethanol from biomass sources such as wood chips and fibrous plant residues. Harris furnished equipment, design engineering and installation services, working closely with Qteros to integrate used owner furnished equipment and new equipment to build the pilot plant. Harris developed the process engineering and controls to match Qteros’ technology requirements. The project was closely documented to ...
Read More
12.02.14
The Physician Assistant Program at Bethel University provides training to students seeking jobs to fill an important and growing new role within clinics and hospital systems. Bethel University was on a fast-track to create a learning space for their new program, which involved an upgrade an existing office space to a state-of-the-art hands-on lab and classroom that would include patient simulators. Driven by enrollment, the renovation had to be done in a relatively short space of time.
...
Read More
08.06.14
Building 10
When the National Institutes of Health (NIH) needed to upgrade its central chilled water system, it turned to its longtime partner Harris for vital infrastructure work with a minimum of service disruption to NIH’s critical scientists and medical professionals.
Building 14
Structural steel and catwalks were carefully set in place for mechanical room hookups from the central plant. Hundreds of feet of chilled water mains, steam and steam condensate up to 14 inches in diameter ...
Read More
08.06.14
Washington National Cathedral was first air conditioned in the mid-1970s by Harris who installed large air handlers to bring in air from the outside and recycle air from the interior. However, the Cathedral did not have the resources at the time to add the pipes and chiller to cool the vast interior. In 2000, several donors stepped forward donating the necessary funds needed to complete the job, and Harris was once again called on to provide all mechanical services.
Read More