Abbott Emergency Department Renovation

Harris was hired by JE Dunn Construction for a complete mechanical and plumbing upgrade for the 48,000-square foot emergency department remodel project at Abbott Northwestern Hospital. This project included a new heating water system and upgraded built-in-place custom air handling unit. The existing dual duct was changed out to a new VAV system with return valves and pressure monitoring and control. An upgraded control system and graphics package was also included for the remodeled emergency department and the adjoining Heart Hospital.

Harris provided BIM, cost estimating, HVAC, medical gas piping and plumbing services. Harris also assisted with the phasing plan so it fell in line with the existing mechanical systems and avoided unnecessary hospital shutdowns.

Read more about Our expertise in:

See more projects
48,000
square foot renovation
  • Location
    Minneapolis, MN
  • Owner
    Allina Health System
  • General Contractor
    JE Dunn Construction
  • Architect
    HGA
  • Engineering Consultant
    Michaud Cooley Erickson
  • Market
    Healthcare
  • Expertise
    Construction
  • Delivery Method
    Design-Assist
  • Scope
    BIM, Cost Estimating, HVAC, Insulation, Medical Gas Piping, Plumbing, Temperature Controls, Test and Balance
  • Completion Date