06.10.14

Lookout Mountain Elementary School

The 85,000-square foot Lookout Mountain Elementary School project was unique in that Harris, working for Adolfson & Peterson Construction, was responsible for the installation of the HVAC system involving the installation of a geothermal field and water source heat pumps. A portion of the design centered around a more traditional heating system but around 50 percent of the complex was served by this geo system. Read More
06.04.14

Bielenberg Sports Center Expansion

Harris served as the Engineer of Record for the Bielenberg Sports Center Expansion project in Woodbury, Minnesota. The expansion project encompassed various buildings that included design and installation of the following: Energy efficient, high performance heating and cooling central plant consisting of eight water-to-water nominal 60-ton heat pumps. Ice making central plant consisting of three water-to-water nominal 60-ton heat pumps. Well field consisting of three groups of 50 bores each with five circuits ...Read More
09.03.13

St. Olaf College Regents Hall

Harris worked extensively with stakeholders and St. Olaf College to design and install a new, sustainable science center. Much of the piping, duct systems and fixture assemblies for the 180,000-square foot building were prefabricated in Harris’ fabrication shop, allowing our company to comply with LEED certification requirements, complete work ahead of schedule and reduce time in the field. To adhere to LEED certification requirements, Harris used low-VOC emitting adhesives and sealants for duct and pipe connections. A ...Read More
09.03.13

East Valley Rehabilitation Hospital

HealthSouth East Valley Rehabilitation Hospital is a new, 40-bed acute medical rehabilitation hospital totaling 47,500 square feet. Harris provided complete plumbing and mechanical systems for the new hospital including medical gas piping, oxygen and vacuum systems. The project included the first installation of Trane’s water-cooled variable air volume (VAV) air handling systems; complete with an internal-cooling tower to provide maximum efficiency to the system. Harris also installed a complete medium and low-pressure ductwork distribution system including VAV ...Read More
09.03.13

East Valley Rehabilitation Hospital Addition

Thanks to the efforts of the project team during the original East Valley Rehabilitation Hospital build-out, Harris was invited back to perform the construction of the 20-bed addition. With the addition of new patient rooms, this new facility also required room for additional support staff including an expanded dining area and new nursing stations. Harris performed all HVAC, plumbing and medical gas piping for the 11,060-square foot expansion. Tie-ins were made to the existing plumbing and medical ...Read More